Barrancabermeja

Status: Completed
Location: Barrancabermeja, Colombia
Sector: Oil & Gas
Date: 2007 – 2010

ECOPETROL

EPC Detail engineering, supply, construction, installation and start-up of plants and facilities of Area 3 “Infrastructure”. As part of this contract, the execution of engineering, procurement and construction of a new concrete dike, sleepers, piping pipe racks and platforms, low voltage distribution, instrumentation and control. Disassembly and relocation of pipes and structures in tanks area.